Rabert T

As an electrical engineer with 5 years of experience, I focus on transformer and circuit breaker reliability in 110/33-11kV and 33/11kV substations. I am a professional electrical engineer with experience in transformer service and maintenance. I understand electrical principles and have expertise troubleshooting, repairing, and maintaining transformers, circuit breakers, and testing them.

Inverse Defined Minimum Time (IDMT) Calculator

Calculator Inverse Defined Minimum Time CalculatorDownload An Inverse Defined Minimum Time (IDMT) Calculator is an online (or) Excel-based tool that calculates the operation time of protective relays using the inverse time characteristics of overcurrent protection systems.  These tools assist in determining the trip time of relays if a...

Essential Oil Immersed Shunt Reactors Commissioning Checklist

Commissioning oil-immersed shunt reactors is essential for ensuring consistent operation in power systems.  These reactors help to regulate voltage and reactive power, so protecting the grid from over voltages.  Mechanical Inspections,  Electrical Testing, &  Oil Analysis  are all part of the commissioning procedure, which ensures that the reactor fulfills...
spot_img

Keep exploring

Electrical Safety Engineer Interview Questions

1). What is the role of an Electrical Safety Engineer? An electrical safety engineer is...

Electrical Panel Testing Checklist

Regular inspection & testing of electrical panels is essential for assuring safety, dependability, and peak...

Wye to Delta Conversion (Star to Delta) Calculator

Wye to Delta Conversion (Star to Delta) Calculator This Wye to Delta conversion (Star to...

High Tension Motor (HT Motor) Operation: Essential Checklist

This checklist is required to ensure that all operational and safety precautions are in...

Electrical Panel Testing Procedure

Electrical Panel Test Electrical panels, which are widely used in all types of substations and...

Electrical Supervisor Interview Question and Answer

1). What are the clearances required for 33kV Installations? The minimum clearances for 33kV installations...

Dry Type Transformer Installation Method Statement

The Dry type Transformer installations that are carried out on-site are included in this...

Australia (AS) / New Zealand (NZS) Electrical & Electronics Standards

The electrical and electronics industries in Australia & New Zealand are subject to an extensive...

Thermal Power Plant Electrical Engineer Interview Questions

1). What are the primary circuits in thermal power plant? The thermal power plant comprises of 4...

Delta to Wye Conversion (Delta to Star) Calculator

This delta to wye conversion calculator will help you transform a delta network of...

Transformer Oil BDV (Breakdown Voltage) Testing Procedure

Transformer oil breakdown voltage is BDV. The BDV, or dielectric strength, of oil is...

Energy Meter Test Procedure

Table of ContentsScopeSetting Up a Test LabTesting Lab ComponentsType TestRoutine TestSoftware TestingCalibration TestMeasurement TestEnergy...

Latest articles

Inverse Defined Minimum Time (IDMT) Calculator

Calculator Inverse Defined Minimum Time CalculatorDownload An Inverse Defined Minimum Time (IDMT) Calculator is an online...

Essential Oil Immersed Shunt Reactors Commissioning Checklist

Commissioning oil-immersed shunt reactors is essential for ensuring consistent operation in power systems.  These reactors...

Step-by-Step Guide to Motor Overhauling: A Complete Procedure

Motor overhauling is the process of restoring or repairing defective electric motors to their...

Electrical Motor Troubleshooting Chart

Electrical motors are essential components in many industrial & commercial applications, & like any machinery, they...