As an electrical engineer with 5 years of experience, I focus on transformer and circuit breaker reliability in 110/33-11kV and 33/11kV substations. I am a professional electrical engineer with experience in transformer service and maintenance. I understand electrical principles and have expertise troubleshooting, repairing, and maintaining transformers, circuit breakers, and testing them.

Functional Testing for Electrical Systems

To ensure an electrical installation's safety, performance, and reliability, an entire checklist of functional tests must be performed.  Table of ContentsGeneral Functional Checks and InspectionsMV Switchboard and MV Cable TestingLV Switchboard TestingCable TestingDiesel Generator / Generating Plant TestsHydraulic TestsLV Power Distribution System TestingLighting System TestingLightning...

Substation Testing Interview Questions

1). What is CT? A Current Transformer (CT) is an instrument transformer that reduces large currents to a safe, quantifiable level for metering and protection systems.  It develops the primary current on a smaller scale in its secondary winding. 2). What are Errors of CT? CT errors result...
spot_img

Keep exploring

Polarity Test of Transformer

Table of ContentsWhat is Polarity Test?Polarity Test in CircuitWhy do a Polarity Test?Polarity Testing...

What is PLC Ladder Logic? Explain it’s Function

Table of ContentsWhat is PLC Ladder Logic?Ladder LogicLadder Logic StructureLadder Logic ComponentsWorking of Ladder...

Armature Current Calculator

In the field of electrical engineering, armature current is an essential concern, particularly when...

Control Panel FAT Procedure

Table of ContentsPurposeScopeResponsibilityReference DocumentProcedureFactory Acceptance Test (FAT) for Control Panel Control PanelType TestRoutine TestChecking Protective...

Electrical Engineering Interview Questions – Part 4

1). What is Latching Current? The gate signal will be applied to the thyristor to...

Electrical Power Load Calculation Worksheet

Table of ContentsExcel ToolProcedure for Calculating Load UsageStep-1: Total Load ConnectedStep-2: 70% Connected Load...

What is Surge Impedance Loading (or) SIL?

Table of ContentsWhat is Surge Impedance?Surge Impedance Formula (SIL Formula)Important Information on Surge ImpedanceWhat...

Phase Sequence Indicator Calibration Procedure

Table of ContentsPurposeScopeSafety PrecautionsReferenceTools RequiredDefinitionsResponsibilitiesCalibration RequirementsCalibration ConditionsGeneral GuidelinesPreparationInitial InspectionConnection & Setup6 Steps Calibration ProcedureVerificationDocumentationCompletionRegular...

Transformer Erection Checklist

Table of ContentsTransformer Pre-Installation ChecklistEquipment & ToolsSafety MeasuresTransformer Arrival & InspectionPre-Installation TestsTransformer ErectionTestingCommissioningDocumentation Maintenance and...

SOP of Meter Testing (On-Site)

Table of ContentsPlanningInstrumentationVerifying Metering System AccuracyTest InterpretationInstallation Checkup The periodic testing of consumer metering installations...

FAT Procedure for Low Voltage (LV) Switchboard

Table of ContentsPurposeWorking LocationEquipment to be UsedFAT ProcedureVisual Inspection TestInsulation TestHigh Voltage Injection TestPrimary...

Busbar Current Calculator

The electrical power system consists of many incoming & outgoing feeder connections, for which busbars...

Latest articles

Functional Testing for Electrical Systems

To ensure an electrical installation's safety, performance, and reliability, an entire checklist of functional...

Substation Testing Interview Questions

1). What is CT? A Current Transformer (CT) is an instrument transformer that reduces large...

Auto Reclose Relay Testing Checklist

Auto reclose relays are essential parts of modern power systems, boosting system reliability and...

ACDB Panel – Functional Test Checklist

Electrical panels are the basis of power distribution systems, & their safe and efficient...